Bernold, L E (2005) Automatic As-Built Generation with Utility Trenchers. Journal of Construction Engineering and Management, 131(06), 740–7.

Chan, W T, Chen, C, Messner, J I and Chua, D K (2005) Interface Management for China’s Build–Operate–Transfer Projects. Journal of Construction Engineering and Management, 131(06), 645–55.

Chen, H, O’Brien, W J and Herbsman, Z J (2005) Assessing the Accuracy of Cash Flow Models: The Significance of Payment Conditions. Journal of Construction Engineering and Management, 131(06), 669–76.

Chua, D K and Goh, Y M (2005) Poisson Model of Construction Incident Occurrence. Journal of Construction Engineering and Management, 131(06), 715–22.

Hanna, A S, Taylor, C S and Sullivan, K T (2005) Impact of Extended Overtime on Construction Labor Productivity. Journal of Construction Engineering and Management, 131(06), 734–9.

Song, J, Fagerlund, W R, Haas, C T, Tatum, C B and Vanegas, J A (2005) Considering Prework on Industrial Projects. Journal of Construction Engineering and Management, 131(06), 723–33.

  • Type: Journal Article
  • Keywords: Construction methods; Construction management; Decision making; Decision support systems; Modular structures; Prefabrication;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2005)131:6(723)
  • Abstract:
    Prefabrication, preassembly, modularization, and off-site fabrication, collectively termed as prework have become more viable with recent advances in design and information technologies. These construction methods offer a substantial opportunity to improve project performance when circumstances merit. Successful implementation of these methods on a particular project requires systematic analysis and early decision making based on specific factors of the project. This paper identifies those factors influencing decisions on the use of prework, and current industry practices for evaluating the applicability of prework on industrial projects. It then presents a decision framework to assist industry practitioners with evaluating the applicability of prework on their project, and describes a computerized tool to aid project teams in the decision-making process. The developed framework and tool are useful and effective in the decision-making process, and easy to use, as validated by practitioners in the industry.

Sturts, C S and (Bud) Griffis, F H (2005) Addressing Pricing: Value Bidding for Engineers and Consultants. Journal of Construction Engineering and Management, 131(06), 621–30.

Tamate, S, Suemasa, N and Katada, T (2005) Analyses of Instability in Mobile Cranes due to Ground Penetration by Outriggers. Journal of Construction Engineering and Management, 131(06), 689–704.

Zayed, T M (2005) Productivity and Cost Assessment for Continuous Flight Auger Piles. Journal of Construction Engineering and Management, 131(06), 677–88.

Zayed, T M and Halpin, D W (2005) Pile Construction Productivity Assessment. Journal of Construction Engineering and Management, 131(06), 705–14.

Zhang, X (2005) Criteria for Selecting the Private-Sector Partner in Public–Private Partnerships. Journal of Construction Engineering and Management, 131(06), 631–44.

Zhang, X (2005) Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects. Journal of Construction Engineering and Management, 131(06), 656–68.